Skip to content
Primed portal frame column and rafter beside an old stone wall

SSD—F-03Frequently asked questions

Can we order material before the drawings are finished?

Answers from SSD — structural steel detailers in West Yorkshire, drawing for fabricators across the UK.

The short answer

Yes, and we'd encourage it. We issue an advance material list of sections, lengths and grades as soon as the model allows, so stock can be ordered from your supplier while detailing continues. Holding-down bolt plans can go out first too.

You can't cut steel until drawings are approved, but you can order it. Holding-down bolt plans go out first so the groundworker isn't waiting on you, and drawings are released in your fabrication sequence rather than all at the end.

SSD—10Free quotes

Got a steel job that needs drawing?

Send us the engineer's drawings and calcs and we'll come back with a free, no-obligation quote — usually by return.