The job
On a large construction project in London, the site offices and health and welfare facilities had to sit above an existing covered entrance ramp.
Heavy-section beams were erected over the ramp to support the offices. The longest heavy sections — shown in green in the model — were 18 m long.
Heavy sections up to 18 m
Built over a live entrance ramp
Temporary works